     61-10-125.  Other fees.  (1) There is charged for a single trip permit for a load that is over the gross allowable load provided for by the formula in 61-10-107(1) but that does not exceed axle limits set forth in 61-10-107(1):
     (a) $10 for distances to and including 100 miles;
     (b) $30 for distances from 101 to 199 miles; and
     (c) $50 for distances over 200 miles traveled.
     (2) (a) There is charged a fee of:
     (i) $200 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 5,000 pounds in excess axle weight;
     (ii) $500 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 10,000 pounds in excess axle weight, with no single axle exceeding 5,000 pounds in excess axle weight;
     (iii) $750 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 15,000 pounds in excess axle weight, with no single axle exceeding 5,000 pounds in excess axle weight;
     (iv) $1,000 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 20,000 pounds in excess axle weight, with no single axle exceeding 5,000 pounds in excess axle weight and no tandem axle exceeding 15,000 pounds in excess axle weight;
     (v) $1,500 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 25,000 pounds in excess axle weight, with no axle or axle group exceeding the maximum weight allowed by a weight analysis conducted by the department of transportation;
     (vi) $2,000 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 30,000 pounds in excess axle weight, with no axle or axle group exceeding the maximum weight allowed by a weight analysis conducted by the department of transportation;
     (vii) $3,000 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 35,000 pounds in excess axle weight, with no axle or axle group exceeding the maximum weight allowed by a weight analysis conducted by the department of transportation;
     (viii) $4,000 for a term permit for a load that is in excess of the limits set forth in 61-10-107(1) but that does not exceed a total of 40,000 pounds in excess axle weight, with no axle or axle group exceeding the maximum weight allowed by a weight analysis conducted by the department of transportation.
     (b) The fees provided in subsection (2)(a) are annual fees but may be prorated on a quarterly basis and may be paid quarterly, semiannually, or annually. However, if the fee is paid other than annually, there is an additional fee of $10 each time a fee is paid.
     (c) A permit issued under this subsection (2) is valid for a period of no less than 1 calendar quarter and no more than 1 calendar year.
     (d) The department of transportation or its agent may not issue a term permit for loads that exceed 10,000 pounds in excess axle weight unless the person applying for the term permit has obtained approval from the department of transportation, through a weight analysis, for the configuration of the vehicle.
     (3) There is charged for a permit to move a load that exceeds the single axle, tandem axle, or axle group limits set forth in 61-10-107(1) the following fee based upon the sum of excess in axle or axle group weights: 
| Total Excess Axle Weight | Calculated Cost of | 
| (pounds) | 25 Miles of Travel | 
| (dollars) | |
| 5,000 | 3.50 | 
| 10,000 | 7.00 | 
| 15,000 | 10.50 | 
| 20,000 | 14.00 | 
| 25,000 | 17.50 | 
| 30,000 | 21.00 | 
| 35,000 | 24.50 | 
| 40,000 | 28.00 | 
| 45,000 | 31.50 | 
| 50,000 | 35.00 | 
| 55,000 | 38.50 | 
| 60,000 | 42.00 | 
| 65,000 | 45.50 | 
| 70,000 | 49.00 | 
| 75,000 | 52.50 | 
| 80,000 | 56.00 | 
| 85,000 | 59.50 | 
| 90,000 | 63.00 | 
| 95,000 | 66.50 | 
| 100,000 | 70.00 | 
| over 100,000 | 70.00 + 3.50 per 5,000 lbs. or | 
| part of 5,000 lbs. in excess of 100,000 lbs. | |
     History: En. 32-1127.5 by Sec. 31, Ch. 316, L. 1974; R.C.M. 1947, 32-1127.5(part); amd. Sec. 6, Ch. 40, L. 1981; amd. Sec. 1, Ch. 571, L. 1993; amd. Sec. 2, Ch. 71, L. 1995; amd. Sec. 1, Ch. 311, L. 2003; amd. Sec. 1, Ch. 24, L. 2005. 
 
 