TITLE 15. TAXATION

CHAPTER 6. PROPERTY SUBJECT TO TAXATION

Part 2. Tax-Exempt Property

Exemption For Land Adjacent To Transmission Line Right-Of-Way Easement -- Application -- Limitations

15-6-229. Exemption for land adjacent to transmission line right-of-way easement -- application -- limitations. (1) Subject to the conditions of this section, for tax years beginning after December 31, 2007, there is allowed an exemption from property taxes for land that is within 660 feet on either side of the midpoint of a transmission line right-of-way or easement.

(2) (a) An owner or operator of a transmission line shall apply to the department for an exemption under this section on a form provided by the department. The application must include a legal description and a digitized certificate of survey prepared by a surveyor registered with the board of professional engineers and professional land surveyors provided for in 2-15-1763 of the property in the county for which the exemption is sought and other information required by the department. A separate application must be made for each county in which an exemption is sought.

(b) An application for an exemption that would be in effect for the tax year and subsequent tax years must be filed with the department by March 1 in the tax year that the exemption is sought.

(3) (a) The owner or operator of a transmission line shall inform the department of any change in ownership of the land or other circumstances that may affect the eligibility of the land for the exemption. The department shall determine whether any changes have occurred that affect the eligibility of the land for the exemption.

(b) The exemption allowed under this section does not apply to:

(i) the boundaries of an incorporated or unincorporated city or town;

(ii) a platted and filed subdivision;

(iii) tracts of land used for residential, commercial, or industrial purposes; or

(iv) the 1 acre of land beneath improvements on land described in 15-6-133(1)(c) and 15-7-206(2).

(4) For the purposes of this section, "transmission line" means an electric line with a design capacity of 30 megavoltamperes or greater that is constructed after January 1, 2007.

History: En. Sec. 9, Ch. 2, Sp. L. May 2007.